[Sep-2022] 100% Actual 1Z0-1066-21 dumps Q&As with Explanations Verified & Correct Answers
1Z0-1066-21 Dumps with Free 365 Days Update Fast Exam Updates
NEW QUESTION 36
Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)
- A. Run plan with 'Refresh with current data'
- B. Manage Plans > Edit Plan Options > Add simulation set
- C. Run plan with 'Do notrefresh with current data'
- D. Open plan > View Supplies and Demands > Remove the sales order fromthe plan and firm demand > Save changes
- E. Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes
Answer: C,E
NEW QUESTION 37
You are defining material planners for your organization. However, when you go to Manage Material Planners, your organization does not appear in the list of values. Why?
- A. The organization must be enabled in Manage Planning Parameters.
- B. You do not have data access to theorganization.
- C. The organization must be enabled in Manage Planning Profile Options.
- D. The organization is an Item Organization.
- E. The organization was not enabled for collection under ManagePlanning Source Systems.
Answer: E
NEW QUESTION 38
Which calendar is supported in the supply planning process but does not support bucketing by week?
- A. Lunisolar
- B. Gregorian
- C. Roman
- D. Julian
- E. Fiscal
Answer: D
Explanation:
NEW QUESTION 39
Which two statements are true regarding Planning Business Flows? (Choose two.)
- A. In automated plans, all release rules must be automatic.
- B. You can analyze and adjust data at any stage of the process.
- C. Inventory Planning cannot run in the Planning Business Flows.
- D. Planners can set up automatic release rules or release orders manually as part of the plan execution.
- E. Demand and Supply Planning have to be run in separate business flows.
Answer: B,D
NEW QUESTION 40
Your client has made a change to item costs. What type of collection do they need to run to only pick up this change?
- A. Item costs cannot be updated via a data collection processes.
- B. Run targeted collection for item costs.
- C. Must run full datacollection. It is not possible to update just item costs.
- D. Item costs is automatically updated. No data collection is necessary.
- E. Run net change collection for item costs.
Answer: B
NEW QUESTION 41
Which disaggregation methods are used for each of these measures: adjusted shipments forecast, target service level, and shipments forecast?
- A. Adjusted shipments forecast usesmeasure, target service level uses same value, and shipments forecast doesn't have any disaggregation method.
- B. Adjusted shipments forecast uses measure, target service level uses equal, and shipments forecast doesn't have any disaggregation method.
- C. Adjusted shipments forecast uses equal, target service level uses same value, and shipments forecast uses measure.
- D. Adjusted shipments forecast uses proportional, target service level uses same value, and shipments forecast uses measure.
- E. Adjusted shipments forecast uses measure, target service level uses same value, and shipments forecast uses self.
Answer: E
NEW QUESTION 42
During an implementation, customer is in the process of planning supply requirements. Customer also needs to generate forecast and safety stock levels. Which plan type on the plan options should the customer be running?
- A. Demand Plan
- B. Integrated Plan
- C. Demand and Supply Plan
- D. SupplyPlan
- E. Safety Stock and Forecast Plan
Answer: C
NEW QUESTION 43
A supply plan has just been run that contains a configured item. You notice that the sourcing rules of the base model were used instead of sourcing rules for the configured item. Why did this happen?
- A. The sourcing rules of the base model had a priority of 1, while the sourcing rules of the configured item had a priority of 2.
- B. No planning percentages were defined at the operation level within the work definition.
- C. The sourcing rules of the base model overrode the sourcing rules of the configured item.
- D. It is not possible to create sourcing rules for the configured item; all configured items always use the same sourcing rules asthe base model.
- E. No sourcing rules have been defined for the configured item.
Answer: E
NEW QUESTION 44
Your client wants to utilize product categories on sourcing rules. They have created a new categoryfor this and populated the items for it.
Where do they set up the category planning uses when evaluating sourcing rules?
- A. Manage Sourcing Rules
- B. Manage Planning Profile Options
- C. Manage Assignment Sets
- D. Manage Planning Source Systems
- E. Manage Plans
Answer: C
NEW QUESTION 45
Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.
- A. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes in this demand plan will reflect in the 2nddemand plan also.
- B. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec
24 and zero for non-impacted days including Dec 25. Causal factor changes in this demand plan will reflect in the 2nd demand plan also. - C. Use FBDI to create a new customerspecific Christmas causal factor. Place value of 1 from Dec 20 to Dec 24. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
- D. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
- E. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec
24 and zerofor non-impacted days including Dec 25. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan. - F. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 34. Causal factor upload to one demand plan will reflect in the 2nd demand plan also.
Answer: A
Explanation:
Explanation
References:
NEW QUESTION 46
What is one method of associating a Safety StockQuantity value to an item?
- A. Enter your value in the Safety Stock Quantity column in the Items page.
- B. Upload the value using File Based Data Import (FBDI)
- C. Enter your value in the Safety StockQuantity Override column in the Items page.
- D. Run the Safety Stock Quantity Update Process.
Answer: A
NEW QUESTION 47
Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.
- A. Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.
- B. Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.
- C. Open a table andselect View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
- D. Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
Answer: B
NEW QUESTION 48
Which four options can be set as a Demand Schedule in Supply Planning plan options? (Choose four.)
- A. Final Transfer Order Forecast
- B. Approved Final Transfer Order Forecast
- C. Approved FinalBookings Forecast
- D. Final Shipments Forecast
- E. Approved Final Shipments Forecast
- F. Final Bookings Forecast
Answer: C,D,E,F
NEW QUESTION 49
What happens when a demand planner approves a demand plan and then adjusts shipment history and runs demand plan again?
- A. Theapprove action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. Any subsequent demand plan run can change final shipments or bookings forecast values that will automatically update the approved forecast measures.
- B. Theapprove action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. After a forecast is approved, the approved values remain unchanged until the forecast isapproved again.
- C. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures
"not editable." But any subsequent demand plan run can change Final Shipments Forecast and Final Bookings Forecast values. - D. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures
"not editable." After a forecast is approved, the Final Shipments Forecast and Final Bookings Forecast measures remain unchanged until the forecast is approved again.
Answer: B
NEW QUESTION 50
A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.
Which statement reflects the system behavior to meet this requirement?
- A. Planning calculates no additional demand but creates the additional required supply based on shrinkage factor.
- B. Planning calculation does not support shrinkage functionality.
- C. Planning calculation creates scrap demand to compensate for loss and maintains supply.
- D. Planning process reduces the demand based on shrinkage factor and keeps the supply quantity as is.
Answer: C
NEW QUESTION 51
Which statement applies only to the planning of back-to-back items and not standard items?
- A. Must have added sourcing rules to the Global OrderPromising assignment set.
- B. Planning collects bookings or shipments history to forecast items.
- C. Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies
- D. Planning pegs reserved supplies to sales orders.
- E. Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.
Answer: C
Explanation:
NEW QUESTION 52
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a differentsupplier globally.
How should they set this up for the easiest maintenance, going forward?
- A. Create a new global sourcing rule for the item;assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
- B. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is forthe remainder of the products.
- C. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
- D. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.
- E. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
Answer: B
NEW QUESTION 53
You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.
- A. In plan parameters, shipment forecast value measure expression is not defined.
- B. In planning measures catalog, shipment forecast measure is not enabled at item and organization level.
- C. In planning measures catalog, shipment forecast value measure is not enabled at item and organization level.
- D. In plan parameters, Item List Price marked as primary does not have price defined for the particular item.
Answer: C
NEW QUESTION 54
......