2023 Realistic HPE6-A80 Dumps Exam Tips Test Pdf Exam Material [Q19-Q44]

Share

2023 Realistic HPE6-A80 Dumps Exam Tips Test Pdf Exam Material

Powerful HPE6-A80 PDF Dumps for HPE6-A80 Questions

NEW QUESTION # 19
For which scenario do Aruba CX 6300M Series switches meet the needs for an upgrade of the wired access layer while the Aruba CX 630QF Series switches do not?

  • A. The customer wants to utilize LACP on AP515 in VSF switch configuration.
  • B. The customer wants to utilize the Aruba AP-515 support for 002 3bz connectivity.
  • C. The Aruba CX 630DM support up to 75W PoE+ per port
  • D. The Aruba CX6300M supports 10GBase-T connectivity with AP-515.

Answer: C


NEW QUESTION # 20
What is one additional benefit trial Foundation Care gives beyond ire included warranty in Aruba products?

  • A. Next Business Day Snipping
  • B. business hour prone support for hardware issues
  • C. unlimited 24x7 access to TAG and online support
  • D. installation and getting started services

Answer: A


NEW QUESTION # 21
Refer to the exhibit.

The exhibit shows the topology for a new Aruba solution. The MCs are in a ctuster and support all of the wireless traffic in the network The core switches route all traffic and support all VLANS. The access fayer switches do NOT use tunneiednode. or dynamic segmentation.
The customer has indicated that it has these VLANS for user devices.
* VLAN 11 for Floori employee wired devices
* VLAN 12 for Floor 2 employee wired devices
* VLAN 13 tor Floor 3 employee wired devices
* VLAN 14 for Floor 4 employee wired devices
* VLAN 15 for Floor 5 employee wired devices
* VLAN 101 for all employee wireless devices
* VLAN 102 for all guest wireless devices
In which locations should the architect plan the VLANs?

  • A. VLANs 11-15 on one MC. VLANs 101 and 102 on the other MC. (Other VLANs will be used on the access layer switches.)
  • B. VLANs 11-15 on the access layer switches on the corresponding floor; VLAN 101 on one MC and VLAN 102 on me other MC
  • C. VLANS 11-15 on the access layer switches on the corresponding floor; VLANS 101 and 102 on both MCS.
  • D. VLANs 11-15. 101. and 102 on both MCs. (Other VLANs will be used on the access layer switches.)

Answer: B


NEW QUESTION # 22
Refer to the exhibit.

This warehouse has the dimensions shown in the exhibit. The warehouse is 20 feet (6 m) high up to a steel railing on the celling. The shelves are about 16 feet (5m) high, and they hold large containers filled with fluid and metal equipment.
The customer needs consistent wireless coverage throughout the warehouse, mostly to support the tablets that employees use to run Inventory tracking and other applications. The warehouse staff works in shifts of 20.
The architect has selected AP-515S. About how many APs should the architect propose?

  • A. about 23-32
  • B. about 6-4
  • C. about 13-16
  • D. about 6-8

Answer: D


NEW QUESTION # 23
A customer has a large network, which includes a main site and many branch sites. The network has a total of about 10.000 wireless devices at the main site and 15,000 wireless devices total at branches.
To fulfill the requirements for a wireless network upgrade, the architect plans to propose;
* 2 7205 MCs at the main site
* 2 7210 MCs at the main site
* 10 7030 MCs at branch sites
* 200 RAPs at branch sites
* 500 CAPS at the main site
* 300 CAPS at branch sites
What is the most cost-effective Mobility Master solution that meets the requirements'?

  • A. MM-HW-5K appliance + MM-HW-5k appliance
  • B. MM-HW-1K appliance
  • C. MM-HW-1OK appliance
  • D. MM-HW-5K appliance

Answer: A


NEW QUESTION # 24
Refer to the exhibit.



A customer needs a wired network upgrade and has complained about performance issues. The architect collected information about traffic now on several switch ports in different locations across the network, and the results are shown in the exhibit. Each of these ports is a 1Gbps port.
What can the architect conclude?

  • A. None of these ports show any periods of congestion
  • B. All of the ports show serious congestion
  • C. Port 1 shows periods of congestion; other ports are not congested.
  • D. Port 3 snows periods of congestion; other ports are not congested.

Answer: A


NEW QUESTION # 25
The architect plans to recommend an upgrade to Aruba CX switches
What is one requirement for the new solution that justifies this recommendation?

  • A. the requirement to support larger ARP tables at the aggregation layer
  • B. the requirement to support tunneled-node at the access layer
  • C. the requirement to support secure IPsec tunneling at the aggregation layer
  • D. the requirement to support smart Rate at the access layer

Answer: C


NEW QUESTION # 26
An indoor sports stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of 72 feet (22 m).
* There is a catwalk around the perimeter of me stadium that is 54 feet (13 m) from me floor.
* There are two scoreboards at either end of the stadium
* The construction of the stadium is concrete and steel.
The customer has indicated a preference for overhead coverage, and the wireless network should support 3500 concurrent clients. The architect plans to install the APs on the catwalk to service sections of the floor below Which type or antennas are recommended for the APS that provide the overhead coverage?

  • A. high gain directional
  • B. vagi
  • C. high gain omnidirectional
  • D. downtilt

Answer: A


NEW QUESTION # 27
A company has several remote sues that operate more or less autonomously. Each site has ns own local services and Internet connection However the company does have a main office with a few centralized resources that the company would like to make available to remote office employees over the Internet connection. Sites range in size and require between 10 and 20 APs.
The customer requires the most cost-effective solution that meets the requirements.
Which solution should the architect recommend for each remote site?

  • A. Remote APs (RAPs) with IPsec tunnels to a main office MC
  • B. Campus APs (CAPs) with a local MC that has an SD-WAN license
  • C. Campus APs (CAPS) with CPSec control channels to a main office MC
  • D. an IAP cluster with an IPsec tunnel to a main office MC

Answer: B


NEW QUESTION # 28
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?

  • A. a pair of MMs for the mall company, but not MCs: MMs control one MC for each retailer with its own SSIDs
  • B. two MCs for the mall company and one MC for each retailer with its own SSIDs, all controlled by the same pair of MMs
  • C. two MCs for the mall company and for all of the retailers, both controlled by the same pair of MMs
  • D. two MCs for the mail company controlled by a pair of MMS; one standalone MC for each retailer with its own SSIDS

Answer: A


NEW QUESTION # 29
Refer to the exhibit.

A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?

  • A. Use directional antennas to avoid lost signal.
  • B. Add about 10 APs to achieve adequate density
  • C. Add a wiring closet closer to the north side.
  • D. Use at least CATS cable to connect to the APs.

Answer: C


NEW QUESTION # 30
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?

  • A. The 7240XM MCs have better redundant power supplies and fan tray component capabilities than 7220 MCs.
  • B. The 7240XM MCs are required to support the large number of wireless clients in this network
  • C. The 7240XM MCS provide a higher number of concurrent GRE tunnels to support 600APs with MCS in L2 clustering.
  • D. The 724QXM MCs can support full CPSec tunnels with this number of APs. while the 7220 MCs cannot.

Answer: B


NEW QUESTION # 31
Compare the scenarios below. For which scenario do AP-575S meet the needs?

  • A. The customer needs APs for an Indoor nigh density environment In which tne customer prefers dual 5GHz operation.
  • B. The customer needs APs for an indoor stadium that requires overhead coverage and directional antennas.
  • C. The customer needs to mount APs in an outdoor area, but that area only has fiber cable available,
  • D. The customer needs APS mounted to a concrete building exterior to provide coverage in a 90 foot (27m) radius from the building.

Answer: C


NEW QUESTION # 32
Refer to the exhibit.

A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000 square root (isr580 sq. m) are a. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?

  • A. Add two Maps subscriptions.
  • B. Add another campaign subscription.
  • C. Remove one Blue Dot Nav subscription.
  • D. Change the campaign subscription to a Maps subscription.

Answer: D


NEW QUESTION # 33
Refer to exhibit.

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?

  • A. Add a mode conditioning cable for each link between the wiring closet switches and the network core.
  • B. Add an aggregation layer, and connect wiring closet switches to the aggregation layer with SFP+- SR transceivers
  • C. Add an aggregation layer, and connect wiring closet switches to the aggregation layer on Smart Rate pons.
  • D. Change the SR transceivers tor each link between the wiring closet switches and me network core to LRM transceivers

Answer: A


NEW QUESTION # 34
A retailer wants to add a wireless network to its stores to provide guest access. The store has wired POS systems which the customer will now replace with wireless systems.
The APs will he installed on the ceilings, which are about S feel (2.4 m) high.
What is one feature on the APs that can help the customer comply with PCI DSS?

  • A. Anomaly-based threat detection
  • B. Physical security with Kensington Security Slots
  • C. Smart Rate ports
  • D. User and Entity Behavior Analytics (UEBA)

Answer: C


NEW QUESTION # 35
Refer to the exhibit.

A customer requires a core switching solution for a very large multi-building campus with about 30;ooo wireless clients and devices. The network will have a flat topology as shown in the exhibit, and MCs will forward all wireless traffic to the core for routing.
The customer had considered Aruba 5400R Series switches, but the architect recommends Aruba S320 switches Instead.
How should the architect justify this recommendation?

  • A. The 3320 switches support a higher density of 10GbE fiber ports than the 5400R Series.
  • B. The 8320 switches are required to eliminate the aggregation layer as the customer desires.
  • C. The 8320 switches have greater performance and larger ARP tables than the 54Q0R Series, as is necessary for a network this size.
  • D. The 3320 switches offer more extensive mobility integration features with Aruba MCs and APs than the 54C0R Series switches do.

Answer: D


NEW QUESTION # 36
Refer to the exhibit.

The network architect has created the 60M shown in the exhibit tor a complete new wired ana wireless solution for a customer. This solution the customer wants to discover and manage every component or the network in Airwave, including twins, MCS, APS, and switches.
How many AirWave licenses dees the architect need to add?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 37
An indoor basKetbaiI stadium has 5.000 seats in two rings:
* The stadium has a ceiling height of GO feet (18 m).
* There is a catwalk around the perimeter of the basketball court, between the court and the seating areas.
* This catwalk is 40 feet (12 m) from the floor.
* There are two scoreboards at either end of the stadium.
* The construction of the stadium is concrete and sleet.
The customer does not want an under-seat, picoceli deployment.
Which AP model is appropriate to provide coverage in the main stadium bawl?

  • A. AP-577
  • B. AP-575
  • C. AP-555
  • D. AP-505

Answer: A


NEW QUESTION # 38
A customer has an existing Aruba wireless solution at their campus. This solution is shown in the exhibit.
The customer now wants to enhance seamless roaming and failover across the solution. The customer wants the least expensive solution that still meets the needs.
Which figure shows the correct changes to the solution to meet the new needs?
A)

B)

C)

D)

  • A. Option D
  • B. Option B
  • C. Option C
  • D. Option A

Answer: D


NEW QUESTION # 39
An archinect needs lo plan a Mobility Master (MM) solution for a customer Requirements include:
* redundancy for the MM
* redundancy for the MCS (seamless failover if up to one fails)
The wireless network consists of
* total APs - 300
* total wireless devices = 20,000
* total MCs = 10
The customer wants the most cost-effective plan that meets me requirements.
Which plan for MMs should the architect select?

  • A. 1 MM-HW-5K and 1 MM-VA-1K
  • B. 1 MM-HW-5K and 1 MM-HW-1K
  • C. 2 MM-HW-5K
  • D. 2 MM-HW-1QK

Answer: D


NEW QUESTION # 40
A customer has critical wired endpoints. However, each endpoint has a single Ethernet connection to the network. The customer wants redundancy in the switch access layer to minimize the chances that an endpoint will lose this connection The architect plans to deploy two Aruba CX 6405 switches in the closet.
Which plan provides the greatest redundancy for this scenario?

  • A. The 6405 switches are not in a VSX fabric, and have redundant power supplies and redundant management modules.
  • B. The 6405 switches are in a VSX fabric, and each has a redundant management module but not a redundant power supply.
  • C. The 6405 Switches are in a VSF fabric, so the individual switches do not need redundant components.
  • D. The 6405 switches are not in a vsF fabric, and have redundant power supplies but not redundant management modules.

Answer: B


NEW QUESTION # 41
Refer to the exhibit.


A customer needs a new branch office solution that:
provides 802.11ac wireless access to local resources and the local Internet connection connects wired and wireless users to resources at the main office in a secure manner The office has 200 users, who will the up to two wireless devices at the same time. The architect has determined that the office requires 10-13 AP-
515s. The customer wants to support a total bandwidth from an or me APS or about 2 cops.
The entire site is currently wired for CAT5e from a single wiring closet, which contains two access switches, a core switch, and the Internet cable modem, which has 10/10O/1OQO Mbps BASE-T ports. The wired networK will handle abouti Gbps of traffic. The switches do not support P0E/P0E+.
About 75 percent of all traffic is destined to the main office
The architect has looked up these specs for 7000 series controllers.
Which MC will meet the needs in the most cost-effective manner?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 42
A company already has an Aruba wireless network The network currently consists of:
* oneMM-HW-1k
* two 7210 MCs in the network core
* two 721GMCsintheDMZ
* 200 AP-515S in Building 1 and Building 5
100 AP-515S each In Building 2r Building 3, and Building 4
The customer now wants to assess if it needs local Mobility controllers (MC) for any buildings:
- Building 1 is the main office building for the campus. It supports the highest number of APs. It connects to the network core without an aggregation layer.
* Building 2 is further away from the Building i. and no roaming is provided between it and the other buildings its access layer connects to the network cone with a pair of Aruba CX 6300M aggregation switches.
* Building 3 is further away from the other buildings, it connects to the network core without an aggregation layer.
The Guest SSID traffic should be tunnelled to the DMZ controllers
' Building 4 has its own local datacenter and Internet connection. The company would like it to be able to operate completely autonomously if its aggregation layer loses connectivity with the core.
* Building 5 is further away from the other buildings, it connects to the network core without an aggregation layer.
This building has been assigned to a partner that would like to manage a dedicated SS1D using the shared AP infrastructure.
In which two buildings should the network architect plan local mobility controllers (MCs)? (Select two)

  • A. Building 3
  • B. Building 5
  • C. Building 1
  • D. Building 4
  • E. Building 2

Answer: A,C


NEW QUESTION # 43
......

Guaranteed Accomplishment with Newest Oct-2023 FREE: https://certmagic.surepassexams.com/HPE6-A80-exam-bootcamp.html