Oracle EBS R12: Advanced Supply Chain Planning Sample Questions:
1. Identify the user Interface for viewing data collected over to the planning server from the transaction Instances.
A) Standard Data Collection
B) Operational Data Store (ODS)
C) Oracle Applications Data Store (ADS)
D) Planning Data Store (PDS)
E) Collection Workbench
F) Continuous Data Collection
G) Planner Workbench
2. The planning engine provides the detailed bills of material (BOM) and Routing information associated with an Item from the Planner workbench.
You right-click and item in the Navigator and select BOM/Routing. The shortcut menu displays some options to further navigate to specific information.
Which two option are NOT displayed?
A) Routing Operations
B) Where used
C) Components
D) Co-Products
E) Process Affectivity
F) BOM Item type
G) Substitutes
3. Identify three correct statements about phantom Items?
A) One Bill of Material can represent a phantom subassembly for one parent Item, but It cannot be a stocked subassembly for another parent Item.
B) A phantom subassembly is a nonstocked subassembly that enables you to group the material needed to produce an assembly.
C) Oracle Work In Process explodes through a phantom subassembly to the components as If the components were tied directly to the parent assembly.
D) The full cost rollup process sets the pending phantom assembly burden to 1.
E) You cannot define routing for phantom assemblies the same way as other assemblies.
F) You can compute manufacturing and cumulative lead times for phantom assemblies that have routings.
4. For Buy or Transfer orders, the Dock Date for Scheduled Receipts Is calculated as the
A) end of Preprocessing Lead Time or beginning of Processing Lead Time
B) end of Processing Lead Time or beginning of Postprocessing Lead Time
C) beginning of Preprocessing Lead Time
D) end of Postprocessing Lead Time
5. A constrained plan with the Enforce Capacity Constraints option is run and you are asked to analyze Late Demands in the plan.
Which two exception messages are critical In the above case?
A) Sourcing Split Percentage violated
B) Demand quantity not satisfied
C) Late Replenishment for Sales Order
D) Order is firmed late
E) Late Replenishment for Forecast
Solutions:
| Question # 1 Answer: E | Question # 2 Answer: A,E | Question # 3 Answer: C,D,F | Question # 4 Answer: D | Question # 5 Answer: B,C |
We're so confident of our products that we provide no hassle product exchange.


By Herman

