Huawei H12-421-ENU Exam Overview:
| Certification Vendor: | Huawei |
|---|---|
| Exam Name: | Huawei Certified Network Professional-Data Center Facility-Build Facility Deployment Optimization V2.0 |
| Exam Number: | H12-421-ENU |
| Passing Score: | 600/1000 |
| Exam Duration: | 90 minutes |
| Certificate Validity Period: | 3 years |
| Real Exam Qty: | 60-80 |
| Related Certifications: | HCIP-Data Center Facility Deployment HCIA-Data Center Facility |
| Available Languages: | Chinese, English |
| Exam Format: | True/False, Fill-in-blank, Drag-and-drop, Multiple-choice, Single-choice |
| Exam Price: | USD 160 |
| Recommended Training: | HCIP-DCF-BFDO Official Training |
| Exam Registration: | Huawei Talent Official Pearson VUE Registration |
| Sample Questions: | Huawei H12-421-ENU Sample Questions |
| Exam Way: | Delivered via Pearson VUE; available as onsite test center or online proctored exam |
| Pre Condition: | Recommended: HCIA-Data Center Facility certification or equivalent knowledge and 1-2 years of relevant experience |
| Official Syllabus URL: | https://e.huawei.com/en/talent/certification |
Huawei H12-421-ENU Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Power Distribution & UPS Systems | 25% | - Installation, commissioning and troubleshooting - Battery management and maintenance - UPS2000/5000 series principles and configuration - PDU and power distribution architecture |
| Topic 2: Data Center Facility Overview & Design Principles | 10% | - Site selection and layout planning - Basic concepts and development trends - Standards and specifications - PUE and energy efficiency design |
| Topic 3: Cooling Systems | 25% | - Cooling principles and airflow design - Energy saving and optimization - Installation, commissioning and fault diagnosis - NetCol series precision air conditioners |
| Topic 4: Monitoring & Management System | 15% | - Configuration, alarm and management - System maintenance and optimization - Sensor and device access - ECC800 monitoring system architecture |
| Topic 5: Modular Data Center Solutions | 25% | - Deployment process and specifications - System integration and acceptance - FusionModule500/800 micro data centers - FusionModule1000 integrated solution |
Huawei Certified Network Professional-Data Center Facility-Build Facility Deployment Optimization Sample Questions:
When the integrated UPS is wired, if the input phase sequence is wrong, the machine will not work.
- A. False
- B. True
Correct Answer: B π³οΈ
If the UPS5000-E-400K is bypassed and the maintenance bypass is closed, both the main power module and the bypass module stop working.
- A. False
- B. True
Correct Answer: A π³οΈ
The default battery charge voltage of the UPS2000-G is ( ) V/cell.
- A. 2.15
- B. 2.35
- C. 2.25
- D. 2.45
Correct Answer: B π³οΈ
When the NetCol5000-A indoor unit and the outdoor unit are not installed separately, the refrigerant line is ().
- A. Air
- B. Refrigerant
- C. Nitrogen
- D. Oxygen
Correct Answer: C π³οΈ
UPS2000-A-(1-3kVA) closes the mains input switch and directly enters the bypass working state.
- A. TRUE
- B. FALSE
Correct Answer: B π³οΈ
Viewing page 1 out of 48 pages.
Viewing questions 1-5 out of 240 questions.