SAP C_TSCM42_64 Exam Overview:
| Certification Vendor: | SAP |
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 |
| Exam Number: | C_TSCM42_64 |
| Available Languages: | English |
| Real Exam Qty: | 80 |
| Exam Format: | Multiple Choice, Multiple Response |
| Exam Duration: | 180 minutes |
| Certificate Validity Period: | No expiration (legacy SAP certification; validity policies may vary by SAP certification program updates) |
| Exam Price: | Approximately USD 500-600 (varies by country/region) |
| Related Certifications: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 |
| Passing Score: | 60% |
| Recommended Training: | SAP Learning |
| Exam Registration: | SAP Certification Hub |
| Sample Questions: | SAP C_TSCM42_64 Sample Questions |
| Exam Way: | SAP authorized testing center or online exam delivery where available |
| Pre Condition: | Recommended knowledge of SAP ERP Production Planning and Manufacturing processes, relevant SAP training courses, and practical project experience. No mandatory prerequisite exam. |
| Official Syllabus URL: | https://training.sap.com/certification/ |
SAP C_TSCM42_64 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Production Orders | - Production Order Creation and Processing - Production Order Confirmation and Goods Movements - Production Order Settlement - Production Order Execution |
| Topic 2: Capacity Planning | - Capacity Requirements Planning - Capacity Evaluation and Leveling |
| Topic 3: Advanced Planning Functions | - Long-Term Planning - Integration with Other SAP Components - Available-to-Promise (ATP) |
| Topic 4: Production Planning | - Demand Management and Requirements Planning - Material Requirements Planning (MRP) - Master Data
- Sales and Operations Planning |
| Topic 5: Manufacturing Processes | - Discrete Manufacturing - Repetitive Manufacturing - Process Manufacturing |
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
1. Which types of objects can be changed with Engineering Change Management?
(Choose three.)
A) Work Center
B) Material Master
C) Task List
D) Bill of Materials
E) Production Version
2. The master data for a logistical process is to be stored in the SAP ECC system. In this context, you require the production versions for subsequent planning and production. You know a mass maintenance transaction that you could use here. Where else in the SAP ECC system could you define production versions?
A) In the work center.
B) In the repetitive manufacturing profile in Customizing.
C) In the line routing.
D) In the material master.
3. Which of the following functions occur when a production order is created?
(Choose three.)
A) Selecting and copying a bill of material
B) Calculating the lead time for the production order
C) Copying a document that is assigned to the material master for the product to be produced
D) Selecting and copying a routing
E) Calculating the quantity to be produced on the basis of the available material stocks
4. In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
A) In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
B) Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
C) Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
D) Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
5. In SAP ECC, a customer tests the firming options for planned orders. The customer first sets the manual firming date from the stock/requirements list to firm planned orders that shall occur in the short term. In the material master, a rolling planning time horizon with firming type 1 is active. Some planned orders have also been firmed manually already.
Which statement applies for the resultant firming situation?
A) The firming interval is specified by the firming mechanism that currently stretches further into the future; all the planned orders within this horizon are firmed only if they were previously firmed manually.
B) The firming interval is specified by the manual firming date because it always overrides the planning time fence from the material master; all the manually firmed planned orders are firmed independently of this.
C) The firming interval is specified by the planning time fence from the material master, because this always overrides the manual firming date; all the manually firmed planned orders are firmed independently of this.
D) The firming interval is specified by the firming mechanism that currently stretches further into the future and which firms planned orders that are within it; all the manually firmed planned orders are firmed independently of this.
Solutions:
| Question # 1 Answer: B,C,D | Question # 2 Answer: D | Question # 3 Answer: A,B,D | Question # 4 Answer: A | Question # 5 Answer: D |